WORK EXPERIENCE


High Rise, Mid Rise & Out Of The Ground Construction




250 Fifth Avenue Thomson Hotel
. A new tower connected to a Landmarks Mansion on Fifth Avenue. Double depth Cellar and sub Cellar, Zero Access agreement with the neighboring garage made for an interesting SOE and Foundation design. Large portions of the existing façade had to be shored up and maintained during Construction. Additional Stories and penthouse added to the existing mansion. High end interior finishes and custom millwork throughout the hotel. Empire Management– 125 Million


Boutique Hotel- 12 East 48th Street- New Out of the ground 128 Key High-Rise Hotel. Hidrock Properties. Drilled caissons and mat slab foundation system, monolithically poured Concrete Superstructure with a 3D panel Facade system. A sliver building located on 48th Street Logistically challenging location with a limited access SOE and foundation scope and coordination with owner furnished FF&E.  50 Million

17 West 24th Street- 22 Story Boutique Hotel and Restaurant by Jean Kaufman Architects- a 22 Story sliver Building in Chelsea, that Consisted of underpinning rock excavation, solider piles and lagging, the demolition of an Existing 4 Story Townhome for the erection of a Monolithically poured concrete Building with an "Equitone" Composite panel skin on a rain screen system

National Rent a Car- 5 New Buildings on an existing Site that had to stay functional and operational during construction. A Logistically challenging Project that included the demolition of existing fueling stations and tanks, Car wash buildings, Car rental Buildings and Car servicing stations with New. Entire Site need to be bought to a new Grade, New greywater drainage, Parking systems, Asphalt paving, Asphalt pavement markings, Waiting Canopies, Helical Piles and Footings for new Buildings, Veeder-Root fueling systems and fuel tanks with complex control diagrams and relays built into the safety systems.


SIGMA Whare house expansion and Renovation - New 10,000 square foot addition to the existing warehouse and renovation and branding of the existing office and landscaping/Sitework

GWB Hotel - a proposed 280 Million Dollar 400 Key mixed use hotel and conference center with robotic parking, an Olympic sized swimming Pool, spa and sports complex, three restaurants, twelve elevators and 4 escalators. Monolithically poured concrete superstructure with a precast concrete skin and Curtain walls.- The Alpine Group

Landmarks Renovation


62 Wooster Street- An 8 story Landmarks Building in SOHO that was like building a New Building within the fascia of an existing building. New Underpinning de-watering and Superstructure within the existing Shell. New Structural Steel spanning from the basement to the Roof for an outdoor swimming pool and Penthouse. The highest end luxury Condominiums with statuary bronze finishes and Hand rubbed plank flooring over a multilayered acoustical underlayment.

40 Peck Slip- The NYPD Superior Officers Council- Another project that was like building a building within a Building. Two stories added to a four story Landmark Building, an Elevator Added, Micro piles and footings to support the new steel that spans from the first floor to the penthouse. Full gut demolition and Motion monitoring of adjacent Buildings.

250 Fifth Avenue Thomson HotelA new tower connected to a Landmarks Mansion on Fifth Avenue. Double depth Cellar and sub Cellar, Zero Access agreement with the neighboring garage made for an interesting SOE and Foundation design. Large portions of the existing façade had to be shored up and maintained during Construction. Additional Stories and penthouse added to the existing mansion. High end interior finishes and custom millwork throughout the hotel. Empire Management– 125 Million


School and Institutional

Fashion institute of Technology- Estimator and Project manager for The "A" Building Lobby Renovation. David Smotrich and Partners. Fast track Renovation of The "A" building lobby Consisting of Retrofitting existing Wood Metal Atrium railings with Custom glass panels, New Millwork, Light Fixtures and Tel Data Infrastructure to allow students internet access and Faculty Access control.

Fashion institute of Technology- Estimator and Project manager for The David Dubinsky Faculty Lounge Renovation. David Smotrich and Partners. Custom perforated metal panel ceiling system with integral lighting that looked like metal ceiling panels when not illuminated. Lutron lighting controls and bms tie-ins. a very high end finished product.

MTA Police Facility Merrick Station- New Police station- Estimator/PM. A New Police facility for the MTA Brooklyn College-Roosevelt Hall- 10 million multi phased Interior renovation of - Estimator/PM 

Brooklyn College- ADA Upgrades- ADA upgrades to the  Brooklyn College Campus, New Entrance ways, New Stairs,Full Gut bathroom renovations, New ADA Lifts and New Elevators-  Estimator


Banks, Office interiors and Retail


Washington Mutual Bank- 50 New Retail Bank Roll out Across the tristate area

Fried Frank Harris Shriver Jacob- One New York Plaza- 4.8 mil dollar project that lead into a 50 million dollar 10 year tenant fit out.- Construction Manager/ Chief Estimator

Facconable 636 Fifth Avenue- 25 Mil. High End retail Store on 5th

Center for Architecture 534 LaGuardia -8 Mil. AIA Facility with a geothermal HVAC System - Estimating and Procurement.

Nordstrom- Multiple East Coast Locations -19-25mil  - Estimating and procurement of the trades

Home Depot 23rd st NYC -15 mil.-  Estimating and Procurement

Sothebys-35 mil. Concrete Project Manager - Estimating and Procurement

New York Public Library- 10 mil. Concrete Project Manager / Estimator


Hospital & Laboratory Work

New York Presbyterian Suite for Occupational Services 1.2 Mil. Chief Estimator Medical expansion and renovation 

New York Presbyterian Wright Center for the Aging  - 3.9 Million – Chief Estimator/Preconstruction 

Mount Sinai – Temporary Infusion1.2 Mil Infusion Center – Chief Estimator Competitive Lump Sum Bid

New York Presbyterian - Queens outpatient Clinic 2.8 Million Dollar Medical Facility - Preconstruction/Estimator

Memorial Sloan Kettering Cancer Center 9.8 Million Dollar Laboratory with complex HVAC and Plumbing  scopes of work- from conceptual to 100% CD, Preconstruction Estimator 



EMPLOYMENT HISTORY


Senior Estimator

Michilli, Inc

Lump Sum Bidding, Estimating,  Preconstruction and Procurement of Retail and Office Interiors union and non union.  

Hit List

Dolce and Gabbana – Competitive  Lump Sum Bid- Office interior $1.7 Mil – Non Union  

Ferragamo Shops at Riverside– Competitive Lumps Sum Bid - Retail $860K - Union  

Off White Miami – Retail –  Negotiated 1.2 Mil – non union  

Bond retail - Berkley – Core and shell Competitive Lumps Sum Bid $2.25Mil - Union  

ETRO- Woodbury Commons- Competitive Lump Sum Bid $325K – non union  

Godiva Broadway NYC - $215K – Non Union  

Elf Cosmetics Headquarters NYC - Office interior- Competitive CM Bid – 2.1 Mil – Non Union


Chief Estimator


Michael Anthony Contracting Corp.


2017- Present


Manage a staff of 5. Strategic Estimating and procurement of the trades. Preconstruction Management and proactive participation in the design process ensuring drawings and specifications are complete in order to mitigate potential cost increases and ensure projects will meet budgetary and scheduling parameters. Change order and contract negotiation to ensure that projects remain profitable without compromise to the end product and finish date.


 
Senior Estimator


The Rinaldi Group, LLC


Sep-2015 -Aug 2017


High rise construction estimating from conceptual DD sets to 100% CD sets- Full trade by trade quantitative surveying of the work required to erect and finish the Highrise structures. The generation of preconstruction surveys, feasibility reports and cost projections. Proactive participation in the design process to insure projects do not exceed the budgetary constraints through value engineering and alternate finishes


 
Vice President


Stalwart Construction, LLC.


Vice President of Estimating and Procurement


June 2014 – Sep 2015


Oversee daily operations for Hotel and hospitality Construction. Estimating from conceptual DD sets to 100% CD sets- Full trade by trade quantitative surveying of the work required for hotel refreshes and new Out of the ground Hotels. The maintaining of good relationships with subcontractors and vendors. The procurement of work and strategic estimating of potential new Hotel/Hospitality Projects


 
Chief Estimator


ICS Builder Inc.


Vice President of Estimating and Procurement


Jul 2012 – July 2015


Management of the estimating Department- Lump Sum bidding and the aggressive procurement of the trades.

 
Project Manager/Estimator


CNA Enterprises, Inc.


Aug 2009 – Jul 2012


Estimate, Procure and Manage public works projects ranging from 250K to 15 Million 

Owner & CEO


Aufbau Construction


Jan 2007 – Feb 2009


Construction Management /Design Build firm



 

Chief Estimator


Americon


Jan 2005 – Jan 2007


Management of the estimating Department- Lump Sum bidding Interior construction, High end Retail.



 

Purchasing Agent /Estimator


Ibex Construction


1999- 2005



 

Estimator/Project Manager


RCC Concrete Corp


1996-1998

Estimating and Management of Concrete Superstructure projects ranging from 100K to 20 Million Dollars.



 